Contact

Contact us

Products  | Weiye Aluminum
Location:Home - Products

Industrial/LED Aluminum Heatsink Profile

The aluminum profile heat sink is mainly welded by high-pressure cast aluminum and stretched aluminum alloy. The heat dissipation effect of the aluminum heat sink is better, and the energy-saving characteristics are obvious. In the same room, if the heat sink of the same specification is used, the number of aluminum castings is less than that of steel castings. The aluminum heat sink does not add any additives and has good anti-oxidation and anti-corrosion capabilities. The principle is that once aluminum encounters oxygen in the air, it will form a firm and dense oxide film to prevent further corrosion of the body material.

  • Specification

    Aluminium heat sink

    Aluminium Alloy

    6061 etc.

    Temper

    T6 etc.

    Standard

    GB527-2008 or Other International standards

    Quality Certification

    ISO9001, ISO14001, OHSAS18001, DNV, QUANOD, QUALICAT

    Usage

    Industrial heat sink or led light heat sink etc.

    Surface Treatment

    Powder coating, Anodzing, Electrophoresis, Fluorocarbon, Wood grain, Polish.

    Deep Processing Ability

    Drilling,Bending,Welding, Precise cutting etc.

    OEM Color and Powder

    Akzon Tiger, Jotun, PPG powder are available

    OEM New Mould Design

    Available


FREQUENTLUYY ASKED QUESTIONS(5)
  • 1. Where your factory locates?
    A: Our factory locates in Foshan China, it takes about one hour from Guangzhou Baiyun airport to our factory, about 45 minutes from Canton fair.
  • 2. How is OEM & ODM service?
    A: Our company owns extruding production lines, surface treatment production line.And we have professional engineers that help you analyse the design. Regarding the window and door, curtain wall, we have our own systems for your reference.
  • 3. What it is your payment?
    A: T / T: 30% of total value as deposite should paid by T / T within 3 days when confirmation of order, and the remaining sum should be paid by T / T before packing the container.
    L / C: 30% of total value as deposite should paid by T / T within 3 days when confirmation of order, and the remaining sum should be paid by L / C at sight.
  • 4. What it is your Packing?
    A: Plastic Protective Film + Shrink Film
    Plastic Protective Film + Pear Cotton + shrink Film
    Plastic Protective Film + Kraft paper + wood frame
    Plastic Protective Film + Kraft paper + wood frame + steel trolley
  • 5. What is the Standard Loading Quantity?
    A: 1 * 20GP: Max. length: 5.85 meters Loaded quantity: 10 to 12 tons
    1 * 40HQ: Max. length: 12 meters Loaded quantity: 22-26 tons
    Standard export port:
    Huangpu / Foshan or Shenzhen